<< Click to Display Table of Contents >> How To: Use the Cables Visualizer |
|
1.Create a project.
2.Add equipment.
3.Assign SysNames.
4.Draw cables.
5.Assign Cable Numbers.
6.Open the project Cables grid.
7.Select a group of records to visualize.
8.Click the Settings tab.
9.Adjust settings to suit.
10.Click the Visualize tab.