Difference between revisions of "HOWTO:Using Named Paths"
From WireCAD Online Help
Wirecadadmin (Talk | contribs) |
Wirecadadmin (Talk | contribs) |
||
Line 15: | Line 15: | ||
# Open the Named Paths Grid. Database>Named Paths Grid. | # Open the Named Paths Grid. Database>Named Paths Grid. | ||
# Enter your path data.[[File:Namedpaths1.png|thumb]] | # Enter your path data.[[File:Namedpaths1.png|thumb]] | ||
+ | # Click File>Save to commit your changes. | ||
{{note|Slop Factor should be expressed in decimal form}} | {{note|Slop Factor should be expressed in decimal form}} | ||
== Using a Named Path While Adding a Cable Number == | == Using a Named Path While Adding a Cable Number == | ||
+ | # Double click a cable (be sure that the Edit Cable Data on Assignment button is checked you you see the edit dialog).[[File:Namedpaths2.png|thumb]] | ||
+ | # Click the Misc tab. | ||
+ | # Select your previously named path. | ||
+ | |||
+ | === Length Calculation === | ||
+ | The length field will be populated for you based on the following formula: | ||
+ | ((2(ServiceLoop)) + Length)1 + SlopFactor [[File:Namedpaths3.png|thumb]] | ||
+ | |||
== Using a Named Path in the Cables Database == | == Using a Named Path in the Cables Database == |
Revision as of 13:17, 9 June 2011
Command Line Shortcut: Varied User Permissions Level: All |
Contents
Before You Start
This tool assumes that you have already calculated the cable path length. If you have a scaled floor plan consider tracing the path with a polyline from which you can measure length. Remember when using this method to add in the elevation traverses. Also, the unit of measure of the polyline length will be in DU which you must convert to your unit of measure.
Adding a Named Path
- Open the Named Paths Grid. Database>Named Paths Grid.
- Enter your path data.
- Click File>Save to commit your changes.
Note: Slop Factor should be expressed in decimal form |
Using a Named Path While Adding a Cable Number
- Double click a cable (be sure that the Edit Cable Data on Assignment button is checked you you see the edit dialog).
- Click the Misc tab.
- Select your previously named path.
Length Calculation
The length field will be populated for you based on the following formula:
((2(ServiceLoop)) + Length)1 + SlopFactor